Lightning Strike

During Aprils severe weather events the SPOA irrigation well, located in the Woodland Drive cul-de-sac, received a direct lightning strike. The issue was discovered on 28 April when Bay Power Washing attempted to power-wash the entrance and had no water. The well was inspected by Farve Well service and arrangements were made to have the pump replaced on 29 April. When trying to remove the pump it was discovered the pump was fused to the casing. The wire connections had been melted and the pipe heated and misshapen. The pipe and wire were removed but the pump remained lodged in the casing effectively plugging the well.

The board contracted with Farve Well Service to drill a new well and replace the supporting equipment. That activity will commence ASAP and be completed in the next couple of weeks.

Advertisement

Read Full Post »

The meeting was held 20 April 2021 at 7451 Woodland Dr at 7PM. The meeting was called to order at 1903 with Mark Jenner, Terry Johnson, Tara Lambert and Magnolia Property Management representatives Daniel and Steve Camp in attendance. Financials were reviewed and minutes approved before moving on to new business. Dues collection for 2021 is going well with a few exceptions. There have been numerous violation and reminder letters sent from Magnolia Management with corrective action being executed within reasonable timelines. Currently there are 5 homes under construction in the neighborhood along with on-going tree removal, roof repairs and fence replacements. The county was contacted about road deterioration at the intersection of Stablewood Dr and Woodland intersection and responded to within 3 days.

The Board contracted with Trinketbox to install 9 large boulders around the perimeter on the Woodland Dr cul-de-sac. This was done in an effort to reduce vehicles driving through and destroying the landscape, the irrigation lines and valves. The Board also approved a landscaping plan for the cul-de-sac to incorporate the rocks into the overall design.

The entrance was power-washed and we are in negotiations to establish a quarterly contract with the vendor.

The next Board meeting is scheduled for July 20, 2021 at 7PM with locations TBD closer to the meeting. The Board assignments are: President – Mark Jenner, Vice President – Rod Jenkins, Treasurer – Terry Johnson and Tara Lambert – Secretary.

The meeting was adjourned at 2005.